Power UpThe IFD™ TE should be connected and power up only when the User is confident that all the Pre-Use Checks have been carried and are acceptable, the ITA is connected correctly and the unit is in a safe environment.
The User is reminded to ensure that they are familiar with hardware, the Power Up and Power Down sequences, and the testing environment before embarking on any IFD™ testing.
|