To preserve correct operation of all variants of the IFD™ TE, always use the following shutdown sequence:
IDFIS™ - Power Off
Ø If NODES™ is open, close all testing screens and forms, and Exit from
NODES™ Options.
Ø Shut Down the Windows Operating System.
Ø Leave the DMM and IDFIS™ Pod Switches set to ON.
Ø Once the Windows Operating System has shut down and the computer has automatically turned OFF, then press and hold the UPS OFF button until it beeps.
Ø The LCD screen will immediately prompt with "Turn of UPS Yes/No", (select the up-arrow, ^ ) button associated with the 'Yes' answer, and unlike the Power-Up sequence, all components will turn off simultaneously.
Ø At this point, the entire IDFIS™, except for power to the UPS itself, should have been turned OFF.
VIFD™ - Power Off
Ø If NODES™ is open, close all testing screens and forms and, Exit from
NODES™ Options.
Ø Press the Power button to the right of the main touch-screen to power down
-
Note that a shut will not be instigated if NODES™ is still running.
-
NODES™ application will not close, if testing is being carried.
Ø During shutdown the Status Display will flash blue – on completion it will flash green.
Ø Select the large rocker switch back to the original, central position – the flashing green Status Display will extinguish.
Ncompass™ 4000 Series - Power Off
Ø If NODES™ is open, close all testing screens and forms and Exit from
NODES™ Options.
Ø Use the Shutdown on the Windows start menu, to turn off the CC.
Ø Switch OFF the Ncompass™ Analyzer by operating the red power switch located adjacent to the power supply socket on the top panel of the Analyzer.
Ø Switch OFF the CC power supply at the mains input.
On completion of power down, all cables should be disconnected on the portable variants before the equipment is moved.